Every successful bidder on a Florida Department of Transportation construction or maintenance contract posts one combined performance and payment bond, written on FDOT Form 375-020-27. It runs to the State of Florida for the full contract price and adds a two-year defect period, a 25% change allowance and an FDOT takeover option.
| Title / common name | Contract Bond, State of Florida Department of Transportation (FDOT) Form 375-020-27, usually called the FDOT contract bond or Florida road and bridge performance and payment bond One instrument covers both performance and payment. FDOT procedure 375-000-001 lists related forms for other contract types: 375-020-59 (performance based bond, year one) and 375-020-61 (subsequent years) for multi-year maintenance contracts, and 375-020-09 for the bid or proposal bond. |
|---|---|
| Bond type | Contract: combined performance and payment bond (statutory public works bond) |
| Industry / license category | Construction / contract surety (state highway, bridge and building contracts) |
| Jurisdiction | United States → Florida → Florida Department of Transportation → section 337.18, Florida Statutes Section 337.18(1)(f) says these are statutory bonds and that section 255.05 (Florida’s general public works bond law) does not apply to them. |
| Who needs it | The successful bidder on an FDOT construction or maintenance contract, before contract execution Section 337.18(1)(a) requires the bond of every successful bidder. FDOT may waive all or part of it where the contract price is $250,000 or less and the project is noncritical, or for qualified nonprofit agencies for the blind or severely handicapped. FDOT’s Local Agency Program forms page also lists the form as “Contract Bond (in Bid Blank)”. |
| Obligee | State of Florida, payable to the Florida Department of Transportation The form binds principal and surety “unto the State of Florida”, with payment “to the Florida Department of Transportation”. Section 337.18 says all bonds shall be payable to the department. |
| Typical penal sum | 100% of the awarded contract price Section 337.18(1)(a). The Secretary of Transportation can allow a lower amount, FDOT can allow incremental annual bonds on multi-year maintenance contracts or successive bonds on phased design-build contracts, and on projects of $250 million or more FDOT can set a partial bond plus alternate security. For contracts of $25,000 or less, the bidder may post a cashier’s check, certified check or money order instead. |
| What it secures | Performance of the contract, two years of defect correction, payment of labour and material claimants, and state taxes The condition covers full performance to plans and specifications within the contract time; remedying defects that appear within two years of final acceptance; payment to everyone furnishing labour, material, equipment and supplies (including persons defined in section 713.01); state workers’ compensation and unemployment taxes; and, on default, liquidated damages and disincentives not withheld from contract proceeds. It also carries the section 337.18(5) liability for double any loss caused by a wrongful or criminal act of the contractor. |
| Contract changes | Surety bound up to 25% over the original contract amount without its approval Under section 337.11(9)(a), as written into the form, the surety stays fully liable for modifications up to and including 25% over the original amount. Above 25%, the surety’s approval is needed to bind it for the excess. Notice of alterations, extensions and forbearance is waived. |
| Takeover on default | At FDOT’s option, the surety takes over the project The surety may not use the defaulted contractor or an affiliate to finish without FDOT’s written consent, and must use a contractor FDOT has qualified where the contract required prequalification under section 337.14. A surety that fails to perform can be disqualified from bonding future FDOT contracts. |
| Payment claims | Non-privity claimants: notice to contractor within 90 days of first furnishing; notice of nonpayment 45 to 90 days; suit within 365 days Section 337.18(1)(c) and (d). Laborers don’t need the first notice. Notices go to both the contractor and the surety, served under section 713.18. Retainage claims run 365 days from final acceptance. The prevailing party recovers reasonable attorney’s fees. |
| Surety requirements | A surety company authorized to do business in Florida The form must show the Florida licensed insurance agent’s name, business address and telephone number. If the attorney-in-fact isn’t a Florida licensed agent, an agent countersigns. A power of attorney must be attached. |
| Form fields | Principal (entity name and bidding office address), surety and its address, penal sum in words and figures, project description, county, federal aid project number, financial project number, contract number, execution date, principal signatures (two partners for a partnership), state of organization, surety signature by agent or attorney-in-fact, agent countersignature block, seals and FDOT district for “Notices to Owner” |
| Form number / edition | Form 375-020-27, Contracts Administration, OGC 08/19 · 2 pages FDOT’s Local Agency Program forms page lists revision date 08/2019. The form tells the contractor to record the bond in the official records of the clerk of court for the county where the work is located before work begins. Checked 2026-11-23. |
| Duration | Until full performance of all covenants, terms and conditions The bond is void if the contractor is not declared in default; otherwise it stays in full force and effect until everything has been performed, including the two-year defect period. |
| Source | FDOT Form 375-020-27, Contract Bond (PDF) (official state form · OGC 08/19 · 2-page PDF · linked, not hosted) Also: FDOT Local Agency Program forms · FDOT procedure 375-000-001, road and bridge contract procurement (PDF) · Section 337.18, Florida Statutes |
| Status | current |
| Last verified | 2026-11-23 |
From the form: “the surety, pursuant to Section 337.11(9)(a), F.S. shall be fully liable under such surety bond to the full extent of any modified contract amount up to and including 25 percent over the original contract amount and without regard to the fact that the surety was not aware of or did not approve such modifications.”
Like the WSDOT Form 272-002B contract bond, it puts performance and payment into one state DOT instrument, where federal and private work usually splits them (see the AIA A312 performance and payment bonds). Our Miller Act and Little Miller Act guide covers Florida’s general section 255.05 bond claims; FDOT work runs under chapter 337 instead.
The 25% clause is a statutory form of advance consent, so read it alongside our guide to consent of surety. Subcontractors and suppliers outside privity should diary the 90-day and 365-day deadlines; our subcontractor payment bond claim guide walks through notice practice.
Open the Source link above for the official FDOT form. We summarize the field facts and quote one short key clause rather than reproducing the form. Global Guarantors doesn’t host copies.