How Saskatchewan's Builders' Lien Act works: 28-day and 7-day payment clocks, notices of non-payment, SCDRO adjudication, 10% holdback, 40-day lien periods, lien security and labour and material payment bonds.
Education only / verify at source / not legal advice. This guide explains Part I.1 (prompt payment), Part II.1 (adjudication), the holdback and lien parts and section 81 (labour and material payment bonds) of Saskatchewan's Builders' Lien Act (the "Act") as it reads in the Publications Saskatchewan consolidation last updated August 13, 2024, together with the Builders' Lien Regulations (as amended to SR 92/2020). Every rule cited comes from a public source retrieved on November 19, 2026 (PT), listed at the end. Publications Saskatchewan consolidations are marked "not official"; the original statutes and regulations govern. Deadlines, notices, adjudications, liens and bonds turn on the contract, the dates and the facts: read the Act, your contract and the bond, and ask your lawyer.
Start here: Surety 101: three parties, one written promise · Contract surety hub · Lien bonds and vacating liens in Canada
Saskatchewan changed how construction money moves on March 1, 2022. That day the province proclaimed The Builders' Lien (Prompt Payment) Amendment Act, 2019, which added two parts to the old Builders' Lien Act: prompt payment, with a 28-day clock for owners and a 7-day pass-through for contractors, and interim adjudication, with a statutory 30-day decision by an adjudicator drawn from a roster run by the Saskatchewan Construction Dispute Resolution Office (SCDRO). The lien, holdback and trust rules in use since 1986 stayed in place beside them.
The new rules sit in the same Act that already binds the Crown and municipal owners, and the Act leaves highways contracts outside it. On a highways contract the Act's lien and prompt payment rules are not available, so the contract terms and any bond matter more.
For sureties, the regime speeds up the cash cycle on bonded projects, produces binding determinations payable within 10 days, keeps a 10% holdback and a land lien that can be swapped for money or security in court, and gives labour and material payment bond claimants a statutory right of action against the surety (s. 81).
The current Act is chapter B-7.1 of the Statutes of Saskatchewan, 1984-85-86, effective January 1, 1986. Prompt payment and adjudication arrived through chapter 2 of the Statutes of Saskatchewan, 2019, assented to May 15, 2019, but were not proclaimed at once. The Government announced on October 20, 2021 that they would take effect March 1, 2022, and confirmed it that day. Both releases name the SCDRO, a not-for-profit corporation designated by the minister, as the official Adjudication Authority, working with the ADR Institute of Saskatchewan Inc. to provide trained, independent adjudicators.
Section 105.1 sets the transition. A contract made before the amending Act came into force stays under the Act as if the amendments were not in force, regardless of when its subcontracts were made. The same applies to an improvement on premises under a lease first entered into before that date. A law firm's commentary notes adjudication became more active partly because it was unavailable for older contracts. For a surety, that means a Saskatchewan file may sit under two rulebooks; always ask for the prime contract date.
The latest amendment listed in the consolidation is The King's Bench Consequential Amendments Act, 2024 (SS 2024, c 4), which changed court-name references in ss. 2, 83, 86 and 89. Publications Saskatchewan shows the Act's last update posted August 13, 2024, and the Regulations' March 1, 2022 (amended to SR 92/2020). No bill amending the Act by name appears on the Legislature's progress-of-bills lists for the current legislature (third-session list dated November 17, 2026).
An "improvement" is broad: anything constructed, built, altered, repaired, dug or drilled on or into land, including landscaping, excavation, demolition and architect, engineer and land surveyor services (s. 2(1)(h)). A "contractor" contracts directly with the owner; a "subcontractor" is anyone below it; the "payer" is whoever owes under a contract or subcontract.
Some people are excluded from prompt payment and adjudication. The Regulations take three groups out of Parts I.1 and II.1: persons contracting for an improvement relating to a mine or mineral resource other than oil or gas (including exploration, development, production, decommissioning and reclamation); architects, engineers and land surveyors; and persons contracting for improvements related to electrical generation, transmission or distribution infrastructure under The Power Corporation Act (Regulations ss. 5.1, 5.3). The lien, holdback and trust parts still apply to them.
The Crown is bound. Section 5(1) binds the Crown except as otherwise provided, and "Crown" includes the Crown in right of Saskatchewan, its agents, and boards, local authorities and municipal corporations created under listed statutes such as The Cities Act, The Municipalities Act and The Education Act, 1995 (s. 2(1)(d)). No lien attaches to Crown land (s. 26), and a claim against a Crown owner is given to the owner instead (s. 52).
Highways and Crown streets are out. The Act does not apply to a contract under The Highways and Transportation Act, 1997 or to construction or improvement of a Crown-owned street or highway, though it does apply to a Crown-owned bridge not built under that Act (s. 5(2)–(3)).
Contracting out. Section 99 voids any covenant by a person providing services or materials that the Act does not apply, and deems every contract and subcontract amended to conform. A clause naming the adjudicator is of no force or effect (s. 21.32(2)). A contract may set its own adjudication procedure only if it complies with Part II.1 (s. 21.22).
Everything starts with the proper invoice: a written bill or request for payment for services or materials under a contract that shows the contractor's name and address; the invoice date and the period supplied; the contract or authority; a description, with quantity if appropriate; the amount payable and payment terms; the name, title, telephone number and mailing address of the person to whom payment is to be sent; and any other prescribed information. It must also meet any further contract requirements, subject to s. 5.3(2) (s. 5.1).
Four rules deserve a diary note:
The SCDRO publishes a proper invoice template. On a payment bond claim, the date the owner received a compliant invoice anchors the 14-, 28-, 35- and 42-day clocks.
| Payment (Act section) | Deadline | Notice to withhold |
|---|---|---|
| Owner to contractor (s. 5.4) | No later than 28 days after receiving the proper invoice | Notice of non-payment no later than 14 days after receiving it |
| Contractor to subcontractor, owner has paid (s. 5.5(1)–(2)) | No later than 7 days after the contractor is paid | Notice of non-payment by the s. 5.5(7) date |
| Contractor to subcontractor, owner has not paid in full (s. 5.5(4)) | No later than 35 days after the contractor gave the proper invoice to the owner | Within 7 days after the owner's notice, or before day 35 (s. 5.5(5), (7)) |
| Subcontractor to its subcontractor (s. 5.6) | 7 days after being paid; if unpaid, 42 days after the proper invoice was given to the owner | Within 7 days after the upstream notice, or before day 42 (s. 5.6(6)–(8)) |
The owner's choice. An owner may refuse to pay all or part of an invoice only if, within 14 days, it gives a notice of non-payment in the prescribed form specifying the amount and detailing all the reasons (s. 5.4(2)). The rest is still due by day 28 (s. 5.4(3)).
Paid in, paid down. A contractor paid in full must pay each subcontractor whose work was in the invoice within 7 days; if paid in part, it pays proportionately, first to subcontractors not caught up in the owner's dispute (s. 5.5(1)–(3)). Each tier below does the same (s. 5.6(1)–(3)).
The day-35 backstop. If the owner has not paid in full by day 28, the contractor must still pay its subcontractors by day 35 after giving the invoice to the owner, unless it gives a notice in the prescribed form that states the amount is unpaid because of the owner, specifies the amount, undertakes to refer the contractor-owner dispute to adjudication within 21 days, and attaches any owner notice (s. 5.5(4)–(5)). The undertaking commits the contractor to take the owner dispute to adjudication.
The day-42 backstop. A subcontractor not paid by the contractor must pay its own subcontractors by the earlier of 7 days after it is paid or day 42, unless it gives its own notice, which includes the 21-day adjudication undertaking unless the cause is the owner's non-payment (s. 5.6(4)–(8)). On request the contractor must confirm the date it gave the proper invoice to the owner (s. 5.6(10)).
Forms. Reasons for non-payment may include retentions under ss. 13 and 28 (s. 5.7), and wage obligations are untouched (s. 5.8). The Regulations prescribe Forms A.1 to A.5. Forms A.2 and A.4 print the 21-day adjudication undertaking and enclose earlier notices; Forms A.1, A.3 and A.5 leave space for the reasons. Notices may be given by personal service, email, fax or registered mail: email and fax take effect on transmission to the address or number in the contract, and registered mail on the fifth business day after mailing unless the recipient shows otherwise (Regulations ss. 5.2 to 5.25).
Counting days. The Act counts in days, not business days; only registered mail under the Regulations uses business days. The Legislation Act (which replaced The Interpretation Act, 1995 in 2019) supplies the general rules unless an enactment shows a contrary intention: a period "after" a day excludes that day (s. 2-28(2)); "clear days" exclude the first and last days (s. 2-28(4)); and a time limit that falls on a holiday, which includes a Sunday, runs to the next day that is not one (s. 2-28(5)). Applying them to a given date is for counsel.
A payment bond does not stop these clocks.
A notice of non-payment is the only lawful way to withhold after the clock starts, and Saskatchewan makes it travel down the chain. A contractor that gets an owner's notice must, without delay, tell its subcontractors, and a subcontractor that gets a contractor's section 5.5(6) notice must tell its own (s. 5.51).
A notice that disputes the amount must detail all the reasons (ss. 5.4(2), 5.5(6), 5.6(7)); the Act does not say what happens to a reason left out. Disputes that are the subject of a notice are expressly adjudicable (s. 21.21(1)(c)).
Interest accrues on an amount not paid when due under Part I.1 at the pre-judgment rate under The Pre-judgment Interest Act or, if the contract sets a different rate for this purpose, the greater of the two (s. 5.9). The same applies to amounts unpaid under a determination (s. 21.7(3)–(4)). We state no rate; it is set elsewhere and changes.
The minister designates the Adjudication Authority on application and may end the designation (Act s. 21.12; Regulations s. 5.4). The Authority trains and qualifies adjudicators, keeps a public registry, and appoints an adjudicator when the parties cannot agree (s. 21.13). The Government and the SCDRO's own site identify the SCDRO as the designated Authority; the designation date is not stated in the sources we opened. An adjudicator needs a certificate of qualification: at least 10 years of relevant construction experience, completed training, no undischarged bankruptcy or indictable conviction and agreement to the code (Regulations s. 5.41).
Either a contract party or a subcontract party may refer a dispute with its counterparty on: valuation of services or materials; payment, including change orders (approved or proposed); disputes that are the subject of a notice of non-payment; amounts retained under ss. 13 and 28; reasonable costs after an unpaid determination; failure or refusal to certify substantial performance; any matter the parties agree to; and any prescribed matter (s. 21.21(1)–(2)).
Limits: no adjudication after the contract or subcontract is completed unless the parties agree (s. 21.21(3)); a single matter unless the parties and adjudicator agree (s. 21.21(4)); and a matter can go to adjudication even while in court or arbitration unless finally determined (s. 21.21(5)). Adjudication runs between the parties to each contract or subcontract, so a sub-subcontractor refers its dispute against the party that hired it.
| Step | Deadline | Source |
|---|---|---|
| Written notice of adjudication to the other party (Form A.6), electronic copy to the Authority | Copy to the Authority within 1 day after giving the notice | Act s. 21.3; Regulations s. 5.51 |
| Adjudicator appointed | If not consented within 4 days, claimant asks the Authority, which appoints within 7 days of the request | Act s. 21.32(3)–(6) |
| Claimant's notice, contract and documents to the adjudicator | Within 5 days of agreement or appointment | Act s. 21.41(1) |
| Response and documents | Within 5 days after receiving the claimant's documents | Regulations s. 5.61(1) |
| Written determination with reasons | Within 30 days of the adjudicator receiving the claimant's documents; extension up to 14 days on request with written consent, or longer by written agreement | Act s. 21.5 |
A determination made after the deadline is of no force or effect (s. 21.5(5)); the claimant may then ask for a new adjudicator and the late one cannot act again on that dispute (Regulations s. 5.71). Related adjudications can be consolidated by agreement or at the contractor's election within 5 days of the adjudicator receiving documents (s. 21.31; Regulations ss. 5.52, 5.6).
Costs and fees. Parties bear their own costs unless a party acted frivolously, vexatiously, in abuse of process or in bad faith (ss. 21.6, 21.61). The adjudicator's fee is agreed or set by the Authority, split equally unless the adjudicator orders otherwise (s. 21.4). The Regulations require the Authority to publish a minister-approved fee schedule on its website (s. 5.5). On the SCDRO's fee page read November 19, 2026, the non-refundable claimant filing fee is $500 for disputes under $25,000 and $1,000 over $25,000, with a published adjudication fee schedule and an administration charge of 20% (under $50,000) or 25% ($50,000 and over) withheld by the SCDRO. Read the current page. The SCDRO's pages say the notice goes to it "within 24 hours" against the Regulations' 1 day; treat the shorter reading as safer.
Binding, but interim. A determination binds the parties until a court order, an arbitral decision under The Arbitration Act, 1992, a written agreement or a set-aside (s. 21.52). A court or arbitrator may still consider the merits.
Pay in 10 days; stop work. The party ordered to pay must do so within 10 days of communication, subject to holdback (s. 21.7(1)–(2)). If a contractor or subcontractor is not paid, it may suspend work until it receives the amount, interest and reasonable suspension costs, plus its reasonable costs of resuming (s. 21.7(5)–(6)).
Court filing. The winner may file the determination with the Court of King's Bench for enforcement as a court order within two years (or two years after a failed set-aside application is finally decided) and must notify the other party within 10 days (s. 21.71). Once filed, any related duty of that contractor or subcontractor to pay its own subcontractor is deferred until the outcome of the enforcement (s. 21.71(4)).
Setting aside. Within 30 days of communication a party may apply to court on listed grounds: legal incapacity; invalid or ended contract; a matter outside Part II.1 or unrelated to the dispute; a person other than an adjudicator conducting the adjudication; non-compliant procedure; reasonable apprehension of bias; or fraud (s. 21.62(1)). The court may order amounts returned. An application does not stay the determination unless the court orders it (s. 21.62(4)–(5)).
Two linkages. Amounts determined payable or overpaid before a substantial performance certificate are added to or deducted from the price when substantial performance is tested (s. 3(3)). And where a lien's subject is also adjudicated, the lien is deemed not to expire for registration purposes until the later of its normal expiry and 45 days after the adjudicator received the documents (s. 52.1).
The 10% rule. Each payer on a contract or subcontract under which a lien may arise must retain 10% of the greater of the value of services or materials actually provided and any payment made on account of the price, whether payment is periodic or on completion (s. 34(1)–(2)).
It cannot fix a default. The holdback may not be applied to complete the work, pay damages for non-completion, satisfy another claim against the defaulter or otherwise remedy the default (s. 35). A payer that fails to release on time is liable to lien claimants who suffer loss (s. 36), and an owner is personally liable to each valid lien claimant up to that claimant's share of the holdback (s. 37).
The holdback trust account. Subject to exceptions, an owner must open an account at a chartered bank, credit union or trust and loan corporation, pay the holdback into it and administer it jointly with the contractor; payments out need both signatures and, where a lien exists, go directly to lien claimants in proportion (s. 38(2)–(5)). It does not apply where the Crown is owner, to contracts for a house or for repairs or renovations to a four-plex or condominium unit, or to architect and engineer contracts (s. 38(11)).
Paying up to 90%. A payer may pay up to 90% of the price without jeopardy unless it first receives written notice of a lien; if it receives notice and keeps back enough to cover the lien, it can keep paying up to 90% less that amount (s. 40).
Substantial performance and completion. A contract is substantially performed when the improvement (or a substantial part) is ready for use or in use and the rest can be finished, or a known defect fixed, for not more than 3% of the first $500,000 of the price, 2% of the next $500,000 and 1% of the balance (s. 3(1)). It is completed when remaining work costs not more than 1% of the price (s. 4). On request, the payment certifier (or owner and contractor jointly) must decide within 7 days and, if met, certify (s. 41); failing without reasonable excuse creates liability (s. 42), and refusal can itself be adjudicated (s. 21.21(1)(f)).
A person who provides services or materials to an improvement has a lien on the owner's interest in the land and on the materials for the unpaid price (s. 22(1)). It arises when the person first provides services or materials (s. 27), cannot be for interest (s. 25), does not exist for a claim under $100 (s. 24) and is a charge on the holdback and any further amount owed in relation to the improvement (s. 33). It cannot attach to Crown land (s. 26(1)); against a Crown owner it works as a charge on holdback and amounts owing, and the claim is given to the owner or ministry rather than registered (ss. 26(3), 52).
Registration. A claimant applies to the registrar to register an interest based on a claim of lien in the prescribed form (Form E), verified by affidavit; the registrar notifies the registered owner and prior mortgagees (s. 50; Regulations s. 9). Unless a claim of lien is registered or given, the lien expires under s. 49.
| Situation | Holdback release | Contractor's lien expires if unregistered |
|---|---|---|
| Contract certified substantially performed | 40 clear days after a copy of the certificate is given (s. 43(1)(a)) | For work to that date: 40 clear days after a copy is given (s. 49(2)(b)) |
| Work after substantial performance, or no certificate | 40 clear days after the earlier of completion or abandonment (ss. 43(1)(b), 44) | Same period (s. 49(2)(c)) |
| Subcontract certified | Holdback reduced by that subcontract's share 40 clear days after a copy is given (s. 45) | Other claimants' periods may run from the subcontract certificate (s. 49(3)) |
| Price over $25,000,000, schedule over one year, no lien registered, early-release notice given and posted | Annual release 40 clear days after notice (s. 46) | 40 clear days after notice for work to the anniversary (s. 49(2)(a), (3)(a)) |
Section 49(3) sets five cases for subcontractors and suppliers; use the section, not this table.
Late registration. A claim may be registered and an action begun after expiry, but the lien then does not bind intervening registered interests or payments made after expiry and before registration, and charges only the unpaid part of the price (s. 49(5)).
From claim to court. No action to enforce a lien may start unless a claim is registered (s. 54). A lien in an action expires if the action is not set down for trial within two years, unless the court extends (s. 55). A statement of claim must be served within 30 days of issue unless the court allows more (s. 87). Knowingly exaggerating a claim, or claiming a lien one knows one lacks, creates liability for loss (s. 53).
Section 56. Any person may apply ex parte to vacate a registered claim of lien or written notice of a lien by paying into court, or posting security equal to, the full amount claimed plus the lesser of $50,000 or 25% of that amount for costs, and the court shall make the order (s. 56(1)). On notice, the court may vacate on payment or security of a reasonable amount (s. 56(2)). Then:
Section 57. Where the owner would otherwise pay out the holdback, any person may apply on notice to vacate a registered claim; the court fixes the holdback, directs payment into court and vacates, and may require costs security of $50,000 or 25% of the holdback, whichever is less (s. 57).
The Act says security, not bond; whether a surety's lien bond is accepted, and on what terms, follows the court's order. Because a court can reduce or substitute security (s. 56(8)), the bond wording should allow for that.
Municipal and Crown owners. Because "Crown" covers municipal corporations and local authorities, the Act binds them: prompt payment and adjudication apply to their contractors, and holdback is retained, but there is no holdback trust account requirement (s. 38(11)(a)) and no lien on Crown land (s. 26). Section 6(2) makes money payable under a contract by the Crown a trust fund for the contractor. Unpaid parties rely on the holdback charge, the trust and any bond.
What owners ask for. One SaskTenders notice (competition 26-020, posted November 10, 2026 for a Saskatoon Catholic school division's condensing unit replacement) requires a bid bond of 10% of the tender price, a performance bond and a labour and material payment bond each at 50% of the contract amount on signing, and a letter of surety with the tender. That is one small project; each owner sets its own terms. The Construction Association of Saskatchewan sells the CCDC 220, 221 and 222 (2024) bid, performance and labour and material payment forms; see our guides to CCDC 221 and 222, the CCDC 222 wording and CCDC 220 bid bonds.
Highways. Section 5(2) leaves highways contracts outside the Act, so there is no lien, prompt payment or adjudication right under it. A Western Surety advisory reproduces a Ministry of Highways and Infrastructure notice that its labour and material payment bond requires a surety "duly authorized to transact the business of Suretyship in the Province of Saskatchewan". The advisory is undated; get current Ministry forms from the Ministry.
Federal sites. A December 2023 federal Order designates Ontario, Saskatchewan and Alberta. For a project located in a designated province, listed federal provisions (ss. 8(2), 9(5), 10 to 14 and 16(5)) stop applying to the contractor, and the federal Act stops applying to subcontractors and service providers, unless the project straddles a provincial border (federal Act s. 6(2)–(3)). Our federal Act guide covers the federal side.
Labour and material payment bonds. Where such a bond is in effect for an improvement, any person whose payment it guarantees has a right of action against the surety, in accordance with the bond's terms, if the principal defaults (s. 81(1)). The surety is not liable above its undertaking, good-faith payments reduce its liability, and it is subrogated on payment (s. 81(2)–(3)). The bond's own notice and time limits still apply; our subcontractor payment bond claim guide covers the claimant's side.
Right to see the bond. A lien claimant or trust beneficiary may require the owner or its agent, in writing, to provide a copy of any labour and material payment bond posted by the contractor, plus contract terms, state of accounts and holdback account details (s. 82(1)(a)).
Practical intersections for a surety.
This section is an editorial view, not a description of how any surety prices or underwrites. A Saskatchewan contract-surety file raises five questions that follow from the statute:
How sureties weigh or price any of this is not publicly disclosed.
| Regime (status) | Payment clock | Adjudication |
|---|---|---|
| Saskatchewan Builders' Lien Act (in force March 1, 2022, for contracts on or after that date) | Owner 28 days, notice by day 14; contractor 7 days after payment, backstop day 35 | SCDRO |
| Ontario Construction Act (prompt payment October 1, 2019; further amendments January 1, 2026) | Prompt payment of proper invoices | ODACC |
| Federal Act, federal real property (December 9, 2023; Ontario, Saskatchewan, Alberta designated) | Full federal clock outside designated provinces; in Saskatchewan, listed contractor provisions only (s. 6(2)) | Federal regime outside designated provinces |
| Alberta PPCLA (effective August 29, 2022; longer older contracts compliant by August 29, 2024) | Owner 28 calendar days, notice within 14 calendar days; contractor 7 calendar days | Nominating Authorities |
| BC Construction Prompt Payment Act (assented November 27, 2025; Parts 1 to 6 not in force as of November 17, 2026) | Not yet operative | Not yet operative |
Saskatchewan follows Ontario's outline: invoice, 28-day payment, adjudication. Differences to remember: the notice is a notice of non-payment, the 30 days run from the adjudicator receiving the claimant's documents, and a late determination is void. Our Ontario holdback guide covers Ontario's holdback; the BC page is linked below.
For a contractor or subcontractor on a Saskatchewan job
For an owner or project team
For a surety, broker or claims professional
When did Saskatchewan's prompt payment rules start? March 1, 2022, for contracts entered into on or after that date and their subcontracts. Older contracts, and improvements on premises under older leases, stay under the earlier rules.
How long does a Saskatchewan owner have to pay? 28 days after receiving a proper invoice, unless it gives a notice of non-payment within 14 days for the part it disputes. The undisputed amount is still due by day 28.
Must a general contractor pay subcontractors if the owner has not paid? Generally yes, by day 35 after giving the proper invoice to the owner, unless it gives a notice of non-payment with a 21-day undertaking to adjudicate and a copy of any owner notice.
Who runs adjudication, and how fast? The SCDRO is the designated Authority. The adjudicator must decide within 30 days of receiving the claimant's documents, extendable by consent, and a party ordered to pay has 10 days.
How long do I have to register a lien? An unregistered lien generally expires 40 clear days after a certificate of substantial performance, completion or abandonment, depending on the case. A claim must be at least $100, and an action must be set down for trial within two years.
Can I lien a highways or Crown project? The Act does not apply to highways contracts. No lien attaches to Crown land, but against a Crown owner the lien works as a charge on holdback and amounts owing. A labour and material payment bond gives guaranteed claimants a direct right of action under section 81.
All sources below were retrieved on November 19, 2026 (PT). Dates in parentheses are the dates or currency statements those documents bear. Publications Saskatchewan documents were fetched with TLS certificate verification disabled in curl because the host's certificate chain did not validate on our machine; the documents are public.
Educational explainer only. This page describes Saskatchewan's construction prompt payment, adjudication, holdback, lien and bond rules as the official consolidations and government and SCDRO pages read on November 19, 2026 (PT). It is not a claims-filing or lien-registration service, a substitute for the official statutes, regulations, forms, contract or bond, or legal advice. Global Guarantors is not a surety, broker, insurer, adjudication authority or law firm. If a deadline, a notice, an adjudication, a lien or a bond matters to you, read the source and call your lawyer and your surety professional.
Global Guarantors Education: educational content. This is general education, not legal advice, and not an offer of bonding or insurance. Talk to your surety professional and your lawyer before relying on any payment deadline, adjudication right, lien period or bond on a Saskatchewan project, and read your contract and the bond. Always verify statutes, regulations and forms at primary sources. Last verified November 19, 2026.